Cotswold Mews in Battersea Square London

Cotswold Mews Battersea Square London

Cotswold Mews Ltd in Battersea Square, London is to be redeveloped from commercial office space into residential apartments. Lustre Consulting was appointed to carry out a Phase 1 Desk Study and Flood Risk Assessment to support the planning application. The aim of the Phase 1 Desk Study was to identify any potential sources of contamination at the site and environmental liabilities associated with the proposed development. The Phase 1 comprised a review of historical maps, regulatory data, geology maps and a site walkover.

Cotswold Mews Battersea Square Flood Risk Assessment

Despite now comprising office space, the historical maps and site walkover provided an indication of the site’s industrial past including a 1900’s laundry and 1960’s plastic factory. The remaining large chimney and markings of the previous buildings provided further evidence of these past activities. 

The findings were detailed in a Phase 1 Desk Study report and assessed to determine the level of risk posed to future occupiers, construction workers and surrounding environs. It was considered that the majority of risks were mitigated as a result of the proposed layout and as such a Phase 2 Site Investigation was not required. Lustre Consulting however, prepared detailed recommendations within the Phase 1 Desk Study to ensure that potential unforeseen contamination was also addressed as the development progresses.

Read More From Our Knowledge Centre

What is a Noise Assessment? A Noise Assessment will determine whether any prevailing noise sources could be affecting your site or whether any adverse noise sources could be introduced, and if those noise sources could have an adverse impact on future site users, or off-site noise sensitive receptors. If the Noise Assessment finds that the […]

What is a Noise...

What is a Flood Risk Assessment? A Flood Risk Assessment (FRA) will determine the flood risk to a site from multiple sources. It is usual for a FRA to assess the flood risk from rivers, sea, surface water, sewers or groundwater. The level of risk is in part determined by future site users and/or sensitive […]

What is a Flood Risk...

What is an Air Quality Mitigation Statement? An Air Quality Mitigation Statement qualitatively assesses the air quality impact to future site users and/or local receptors and whether any mitigation measures could be required. Why is an Air Quality Mitigation Statement needed for this site? The Institute of Air Quality Management (IAQM) and Environmental Protection UK […]

What is an Air...

What is a Phase 1 Desk Study? A Phase 1 Desk will determine if contamination could be present at your site, and importantly, if that contamination poses a risk to future site users or the environment. Why is a Phase 1 Desk Study needed for this site? If the Desk Study finds that the level […]

What is a Phase 1...