A former petrol filling station and vehicle servicing garage site in Kent is in the process of being redeveloped into a residential use. Lustre Consulting was initially appointed to carry out a Phase 1 Desk Study in support of a planning application. This was followed by a Phase 2 Site Investigation including a Geotechnical Investigation.
The site historically comprised a servicing and repair garage including a small petrol filling station dating back to pre-1960. The walkover identified the remains of the garage including several underground fuel storage tanks. The Phase 1 Desk Study concluded that the former use comprised a potentially significant contaminative land use and that further intrusive investigation was required.
The subsequent combined Phase 2 Site Investigation and Geotechnical Investigation comprised a combination of windowless sampling and trial pitting. The investigation was designed to target the underground tanks and other identified potential sources of contamination, provide geotechnical information and gain a good coverage across the site.
The shallow soils were found to be generally uncontaminated with the exception of a localised areas of buried waste. Lustre Consulting consequently recommended the removal of the underground fuel tanks and replacement of the buried waste with a Clean Cover System. All stages of the works undertaken to date have been successfully approved by the local Contaminated Land Officer. Lustre Consulting look forward to continuing to work with the developer as the development progresses.
What is a Noise Assessment? A Noise Assessment will determine whether any prevailing noise sources could be affecting your site or whether any adverse noise sources could be introduced, and if those noise sources could have an adverse impact on future site users, or off-site noise sensitive receptors. If the Noise Assessment finds that the […]
What is a Noise...
What is a Flood Risk Assessment? A Flood Risk Assessment (FRA) will determine the flood risk to a site from multiple sources. It is usual for a FRA to assess the flood risk from rivers, sea, surface water, sewers or groundwater. The level of risk is in part determined by future site users and/or sensitive […]
What is a Flood Risk...
What is an Air Quality Mitigation Statement? An Air Quality Mitigation Statement qualitatively assesses the air quality impact to future site users and/or local receptors and whether any mitigation measures could be required. Why is an Air Quality Mitigation Statement needed for this site? The Institute of Air Quality Management (IAQM) and Environmental Protection UK […]
What is an Air...
What is a Phase 1 Desk Study? A Phase 1 Desk will determine if contamination could be present at your site, and importantly, if that contamination poses a risk to future site users or the environment. Why is a Phase 1 Desk Study needed for this site? If the Desk Study finds that the level […]
What is a Phase 1...