Mental health problems affect 1 in 4 people every year.
Lustre Consulting is a small but growing business and we recognise that we are only as good as our people. So, it follows that the wellbeing of our employees is imperative.
As part of a larger wellbeing campaign that we have been initiating in 2015, mental health wellbeing is firmly on the agenda. The result from a ‘Healthy Workplace’ survey showed most staff had experience of mental health conditions either personally, through a close friend or family member.
Lustre directors and staff decided to sign the Time to Change Employer Pledge in October 2015 as a springboard for further action. We are now listed as one of the 345 companies (and counting) that have pledged to end mental health stigma through the “Time to Change” campaign.
Small things can make a big difference when it comes to mental health. Time to Change provide loads of resources on their website on how to start conversations.
Three easy things to remember are:
1. Don’t just talk, listen! –Simply being there for someone can mean the world.
2. Show you care. –Small things make a big difference.
3. Keep in touch. –Text, call, email or meet up -whatever works for you.
What is a Noise Assessment? A Noise Assessment will determine whether any prevailing noise sources could be affecting your site or whether any adverse noise sources could be introduced, and if those noise sources could have an adverse impact on future site users, or off-site noise sensitive receptors. If the Noise Assessment finds that the […]
What is a Noise...
What is a Flood Risk Assessment? A Flood Risk Assessment (FRA) will determine the flood risk to a site from multiple sources. It is usual for a FRA to assess the flood risk from rivers, sea, surface water, sewers or groundwater. The level of risk is in part determined by future site users and/or sensitive […]
What is a Flood Risk...
What is an Air Quality Mitigation Statement? An Air Quality Mitigation Statement qualitatively assesses the air quality impact to future site users and/or local receptors and whether any mitigation measures could be required. Why is an Air Quality Mitigation Statement needed for this site? The Institute of Air Quality Management (IAQM) and Environmental Protection UK […]
What is an Air...
What is a Phase 1 Desk Study? A Phase 1 Desk will determine if contamination could be present at your site, and importantly, if that contamination poses a risk to future site users or the environment. Why is a Phase 1 Desk Study needed for this site? If the Desk Study finds that the level […]
What is a Phase 1...