Lustre Consulting was appointed by a private property owner to undertake a Basement Impact Assessment (BIA) to support a planning application involving the construction of a basement below part of the existing residential property.
The site is situated within the London Borough of Lambeth, whose Local Plan states that “an assessment of the scheme’s impact on drainage, flooding, groundwater conditions and structural stability” is required prior to granting approval.
The site consisted of the ground floor flat of a circa. 1916 end of terrace property with a private garden to the rear, the property has been extended to the rear historically and the proposal included the clearance and replacement of this extension.

The BIA identified a low risk to drainage and flooding, as drainage routes were likely to remain unchanged. The site is located in an area that benefits from river flood defences and is within a low surface water flood hazard area. The groundwater conditions were identified as low risk as the superficial deposits may have perched groundwater which is likely to be of low value and low sensitivity and the bedrock geology of London Clay Formation is an aquitard providing a level of protection to the deeper aquifer. As the proposed development is not extending underneath the original terraced property and all boundary fences and walls will remain as existing, it was considered to be a low risk for structural stability.
The BIA was submitted to Lambeth Borough Council as part of the planning application and planning approval was successfully gained.
What is a Noise Assessment? A Noise Assessment will determine whether any prevailing noise sources could be affecting your site or whether any adverse noise sources could be introduced, and if those noise sources could have an adverse impact on future site users, or off-site noise sensitive receptors. If the Noise Assessment finds that the […]
What is a Noise...
What is a Flood Risk Assessment? A Flood Risk Assessment (FRA) will determine the flood risk to a site from multiple sources. It is usual for a FRA to assess the flood risk from rivers, sea, surface water, sewers or groundwater. The level of risk is in part determined by future site users and/or sensitive […]
What is a Flood Risk...
What is an Air Quality Mitigation Statement? An Air Quality Mitigation Statement qualitatively assesses the air quality impact to future site users and/or local receptors and whether any mitigation measures could be required. Why is an Air Quality Mitigation Statement needed for this site? The Institute of Air Quality Management (IAQM) and Environmental Protection UK […]
What is an Air...
What is a Phase 1 Desk Study? A Phase 1 Desk will determine if contamination could be present at your site, and importantly, if that contamination poses a risk to future site users or the environment. Why is a Phase 1 Desk Study needed for this site? If the Desk Study finds that the level […]
What is a Phase 1...